Public building New Entrance - Fellow Constructor

Search
Go to content

Main menu:

Public building New Entrance

Structure > Infrastructure > Land Transport

          
Location                      
  Beirut – Lebanon
Client                             Bureau Michel Chacar
Design Date                    March 2012
Project Area                    315 m 2 of infrastructure + 100 lm of road
Construction Material       Reinforced Concrete
Completion time              10 days

Nature of Misssion            Architectural    X Structural      Mechanical    Electrical

Type of Mission              X New Design                        Shop Drawings
                                       Conceptual                         Value Engineering
                                       Retrofitting                         Assessment Report

 
Back to content | Back to main menu