CRC Tower - Fellow Constructor

Search
Go to content

Main menu:

CRC Tower

Structure > Buildings > Commercial

          
Location                      
  Angola
Client                             Engineer Michel Abou Abdallah
Design Date                    July 2012
Project Area                    46400 m2
Construction Material       Reinforced Concrete
Completion time              90 days

Nature of Misssion            Architectural    X Structural      Mechanical    Electrical

Type of Mission              X New Design                        Shop Drawings
                                       Conceptual                         Value Engineering
                                       Retrofitting                         Assessment Report

 
Back to content | Back to main menu