Public building Façades renovation - Fellow Constructor

Search
Go to content

Main menu:

Public building Façades renovation

Structure > Buildings > Public/Academic/Sports

          
Location                      
  Beirut – Lebanon
Client                             Louis El Hachem Engineering and Contracting
Design Date                    July 2013
Project Area                    1860 m2 of façades
Construction Material       Reinforced Concrete
Completion time              18 days

Nature of Misssion            Architectural    X Structural      Mechanical    Electrical

Type of Mission              X New Design                    X  Shop Drawings
                                       Conceptual                         Value Engineering
                                       Retrofitting                         Assessment Report

 
Back to content | Back to main menu